Current status of Laser Cutter 1: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
No edit summary |
||
(10 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
water cooling fan's mounted | water cooling fan's mounted | ||
== Current ideas/changes:== | |||
* we move from the idea of honeycomb to laminar airflow system with parallel rods to support the materials. | |||
== | == Next priorities:== | ||
* Order air flow ==> (mro) | |||
* Order Bed frame and support rods ==> hobbybob upload pics | |||
* Order acrilyc for cover-lid (disformes at 10600nm light) | |||
* Order Hose connectors for water cooling | |||
* Order magnetic switch for top-cover | |||
* power cord connector in outer shell | |||
* power distribution to air assist pump | |||
* power distribution to high voltage transformer | |||
* power distribution to water cooling | |||
* duration time meter | |||
* emergency stop | |||
* key switch | |||
== | == Nice to haves for now:== | ||
* Z-bed | |||
** manual | |||
** electric | |||
* Water temperature in and out sensors | |||
== Design changes for next cutters == | |||
* outershell front remove left airhole (in beam path when mirror fails) | |||
* outershell front remove right airhole (copy/paste bug) | |||
* outershell front top right cover corner needs to move by 1 cm. | |||
* outershell top engine bay cover, create holes for hinges | |||
== Done:== | |||
* Inner frame created | |||
* Laser tubes ordered and arrived | |||
* Optics Ordered: | |||
** mirors | |||
==Done:== | ** lenses | ||
Inner frame created | ** glasses | ||
Laser tubes ordered and arrived | |||
Optics Ordered |
Latest revision as of 21:15, 2 June 2013
The outer shell is finished, x axis and y-axis are moving, air hose and wires support on x-axis follow the cart. water cooling fan's mounted
Current ideas/changes:
- we move from the idea of honeycomb to laminar airflow system with parallel rods to support the materials.
Next priorities:
- Order air flow ==> (mro)
- Order Bed frame and support rods ==> hobbybob upload pics
- Order acrilyc for cover-lid (disformes at 10600nm light)
- Order Hose connectors for water cooling
- Order magnetic switch for top-cover
- power cord connector in outer shell
- power distribution to air assist pump
- power distribution to high voltage transformer
- power distribution to water cooling
- duration time meter
- emergency stop
- key switch
Nice to haves for now:
- Z-bed
- manual
- electric
- Water temperature in and out sensors
Design changes for next cutters
- outershell front remove left airhole (in beam path when mirror fails)
- outershell front remove right airhole (copy/paste bug)
- outershell front top right cover corner needs to move by 1 cm.
- outershell top engine bay cover, create holes for hinges
Done:
- Inner frame created
- Laser tubes ordered and arrived
- Optics Ordered:
- mirors
- lenses
- glasses